Sec 1 percentages: choose the base

Before calculating a percentage change, name the amount that counts as 100%. The same numerical change gives a different percentage if the base changes.

What this guide covers

Selected Sec 1 N3 skills: percentage change, reverse checking and percentage points. Longer successive-change comparisons remain in later practice.

Change compared with what?

Percentage increase equals increase ÷ original amount × 100%. Percentage points instead describe the direct difference between two percentages, such as 40% to 55%.

Check the original amount

A price rises from $80 to $92. Find the percentage increase and check by a multiplier.

  1. The increase is 92−80=$12.
  2. Use the original $80 as the base: 1280×100%=15%.
  3. Check: $80×1.15=$92.

Check: Dividing 12 by the new price $92 would answer a different comparison.

Try it yourself

Work on paper, then compare the steps. These checks do not establish mastery.

A fee rises from $45 to $54. What is the percentage increase?

The increase is $9. Relative to the original $45, 945×100%=20%. Check: 45×1.20=54.

A survey result rises from 30% to 45%. How many percentage points is the rise, and what is the percentage increase relative to 30%?

The rise is 45−30=15 percentage points. Relative to the original 30%, it is 1530×100%=50%. These are different measures.

Where this connects

Sources and scope

Original Mentora examples and checks, aligned to Sec 1 N3 in the MOE G2/G3 Mathematics syllabus. They are not reproduced school-paper questions.

MOE G2 and G3 Mathematics syllabuses ↗